Ceiling Tiles & Mould Restoration
Scope of Works
The completed works involved supplying and installing approximately 350 ceiling tiles into the existing grid, disconnecting and reconnecting all light fittings, cameras, and smoke alarms as part of the installation process. All tasks were carried out after hours to minimise disruption, with tarps and drop sheets used to protect produce and stock. The floors were swept nightly at the end of each work session, and mould-inhibiting paint was applied to the entire grid for added protection.
Before
After